Reminder

To have a better experience, please upgrade your IE browser.

upgrade
Cart Get Pricing/Info Find a Reseller More Contacts

Cart

Total: 0 products

  • Choose product to compare

Cancel
Compare with CISCO
Compare with H3C
  • Choose product to compare

Cancel
Compare with CISCO
Compare with H3C
  • Choose product to compare

Cancel
Compare with CISCO
Compare with H3C
  • Choose product to compare

Cancel
Compare with CISCO
Compare with H3C

Select Region

If you cannot find your country/region here,

please fill out a Get Pricing/Info form to submit your requirement. We will contact you as soon as possible.

Background

CEPSA is the second largest petroleum and chemical company in Spain, and one of the top 3 lubricant manufacturers in Europe. As a leader of Spanish industry and trade, CEPSA has long been committed to finding and drilling for oil and gas in Spain, Algeria, and Argentina.

Challenges

Urgent Need for Effective Data Analysis Methods

With the recent concerns regarding climate change, clean energy and new energy have become a hotspot of industry focus. The United Nations (UN) proposed a global incentive plan to drive sustainable energy development, aiming to popularize clean energy by 2030. This clean energy plan includes three objectives: First, popularize clean energy worldwide; second, double the speed of improving energy efficiency; third, double the percentage of renewable energy around the globe.

As a pioneer in the Spanish and European traditional energy industry, CEPSA is dedicated to addressing climate change and developing new energy. Tasked with the mission of making structural adjustments to better fit into the future of the energy industry, CEPSA identified IT as a key factor to increase productivity. Crude oil intelligent exploration, production and management controlling system, and intelligent finance analysis system are the focus of its information system construction.

With Big Data analytics, information has become a main source of enterprise competitiveness. How to analyze Big Data in order to maximize insights and value has become a major concern for the information managers and CIOs of modern enterprises. CEPSA operates at every stage of the petrochemical value chain. During crude oil exploration and production, CEPSA processes large quantities of data; therefore, the company has an urgent need for an effective data analysis solution to improve its exploration and production efficiency.

Traditional databases provide poor performance:

As CEPSA’s business grew rapidly, traditional databases failed to meet Enterprise Resource Planning (ERP) system requirements and were hindering business development.

High procurement and maintenance costs:

CEPSA’s petroleum database system had a traditional IOE structure using another vendor’s computers that were expensive and costly to maintain. Take one of its low-end UNIX servers as an example. The price of a single server is higher than that of six x86 2-socket servers, while having only 1/3 of the CPUs. The maintenance costs were also high. CEPSA needed to pay for warranty services or licenses for UNIX servers, high-end storage, and Oracle databases every year. Maintenance fees for four years were equal to the cost of a new UNIX server. Additionally, traditional UNIX servers and high-end storage architecture require high maintenance skills, which increases the burden for the IT Operations and Maintenance (O&M) Department.

Solution

CEPSA’s IT team talked with multiple vendors to seek a cost-effective solution that met its business requirements and could be flexibly expanded. CEPSA found that Huawei’s solution not only has exceptional performance, but is also flexible and reliable. Telefonica, the integrator of the project, is notoriously strict in choosing hardware providers. Huawei delivered a comprehensive solution in just two weeks. Its quality products and services are highly recognized by both CEPSA and Telefonica.

As early as 2012, Huawei began strategic collaboration with SAP, the leader of the database industry. Together, they have developed and released SAP HANA solutions based on Huawei servers. Huawei has also provided SAP HANA solutions for petrochemical industry giants, such as China Petroleum & Chemical Corporation (Sinopec), China National Petroleum Corporation (CNPC), Turkish National Oil Corporation (TPAO) and Gas Natural Fenosa.

Based on extensive industry experience, Huawei has provided SAP HANA solutions for CEPSA, including mission-critical 8100 V3 and 5885H V3 servers, S5500T converged storage, enterprise-level switches, and SAP HANA to build a reliable and stable new-generation database system.

High-Performance Devices

The 8100 V3 mission-critical server supports up to eight Intel® Xeon® E7-8800 v2 series processors. It delivers superior computing and scalability capabilities, and it is ideal for large mission-critical applications and server consolation and virtualization. CEPSA uses two 8100 V3 servers in its production environment. Each server uses eight Intel® Xeon® E7-8880 v2 series processors and a 6 TB memory Huawei SAP HANA appliance. These servers support its core business production system and optimize the performance of SAP HANA log volume with 800 GB ES3000 V2 PCIe SSDs.

The 4-socket 5885 V3 server supports four Intel® Xeon® E7-4800 v2 series processors. Each processor now supports up to 15 CPUs rather than 10. The maximum cache is increased from 30 MB to 37.5 MB. The process performance is double that of the Westmere-EX (E7-4800). CEPSA uses one 5885H V3 server in its development and testing environment. The server uses four Intel® Xeon® E7-4880 v2 series processors and a 1 TB memory Huawei SAP HANA appliance, greatly improving their development and testing efficiency.

High-Reliability Design

The 8100 V3 provides chip-level fault-tolerant features, such as automatic recovery for processors and links, and supports 60 Reliability, Availability, and Serviceability (RAS) features, ensuring stable system operations. Reliability-improving technologies, such as dual in-line memory module (DIMM) hot swap, memory mirroring, memory sparing, and PCIe hot swap are also supported. Key components, such as Power Supply Units (PSUs), fan modules, and hard disks, are hot-swappable without the need to open the chassis, ensuring continual system operations.

Huawei servers are held to higher manufacture quality standards than the industry average, including standards for production materials acceptance, assembly, and factory testing. In addition, Huawei servers are manufactured based on telecom equipment production platforms to deliver high quality. For example, Huawei performs not only common burn-in tests, but also full disk read/write tests, which are stricter than read or write tests on random sections. Huawei’s high standards throughout the entire production process deliver a 15 percent lower failure rate than the industry average, ensuring stable service operations for CEPSA.

Lower Total Cost of Ownership (TCO)

Based on x86 architecture, Huawei 8100 V3 and 5885 V3 servers use industry standard server components, which do not have procurement and maintenance costs that are as high as enclosed UNIX servers.

The modular design of the 8100 V3 supports DIMM hot swap and tool-free maintenance, which streamlines operation and management, ensures faster deployment, and lower TCO.

As for expansion capability, the 8100 V3 supports up to 192 DIMMs, 24 x 2.5-inch SAS/SATA/SSDs, 16 PCIe cards, and next-generation 40G/100G Ethernet networks, whose flexible expansion capabilities meet changing service requirements. In addition, Huawei 8100 V3 and 5885H V3 SAP HANA appliances can be scaled out to SAP HANA clusters, improving system performance and capacity by adding servers.

Extensive Delivery Experience

As a vendor capable of delivering ultra-large-scale SAP HANA clusters, Huawei has deployed 136 TB clusters for China National Petroleum Corp (CNPC) as well as 15 server nodes and 30 TB clusters for the SAP Research Institute in China. Thanks to its close partnership with SAP and its own strong technical capabilities, Huawei’s global service support team solves technical problems specific to HANA systems, some of which may arise because of SAP HANA clusters’ ultra-large scale.

Benefits

Stable and Reliable New-Generation Database System

CEPSA now experiences many advantages since replacing its original architecture in 2015, and by building a stable, reliable new-generation database system with Huawei’s 8-socket 8100 V3 mission-critical servers and 4-socket 5885 V3 rack servers to run two 6-TB in-memory database systems.

Database performance improvement:

Huawei servers greatly enhance CEPSA’s ERP system performance, which has led to an improvement in production efficiency. When processing Online Analytical Processing or OLAP transactions, CEPSA’s financial analysis system has doubled the number of transactions it can process, meeting strict service requirements.

Highly reliable system:

Leveraging a comprehensive RAS design and rigorous production quality control, Huawei servers achieve a failure rate 15 percent lower than industry average, guaranteeing that the system runs reliably.

Lower TCO:

Based on the x86 architecture, Huawei uses industry standard components, greatly reducing costs for procurement and future capacity expansion.

All-around assurance:

Maximizing Huawei’s extensive SAP HANA delivery experience and service assurance teams worldwide, Huawei provides all-around assurance services for key events, ensuring the system runs both securely and reliably.

WORLDWIDE